Drain
Repair

US Sewer & Drain CIPP Process

Millions of linear feet of cured-in-place materials have been installed worldwide. They have withstood every corrosive environment plus the test of time. Billions of dollars have been saved because excavation was eliminated.

Cured-in-place materials mold to the host pipe. This seamless pipe prevents infiltration and exfiltration, restores structural integrity, eliminates joints that can weaken and allow root intrusion. Cured-in-place pipe actually increases flow capacity because the US Sewer & Drain CIPP Liner is much smoother than old clay and concrete pipe. Above ground there are no piles of excavated dirt, no traffic tie-ups, no subcontractors and most importantly, a happy customer.

Step 1

Mix Epoxy and Prepare Liner

Step 2

Place bladder and liner into place, inflate the liner and allow repair material to dry

Step 3

Remove bladder and reinstate line, if needed

spacer
Copyright © US Sewer & Drain-ACE DuraFlo | All Rights Reserved